Upgrade for the Concentrate Leach Thickener Plant at Olympic Dam

GHD has completed a selection study for the upgrading of the concentrate leaching and thickening operations at Olympic Dam for BHP Billiton.

As a consequence of this, the definition phase of the thickening project is currently underway. The project requires replacement of the existing equipment with a completely new design, an increase in capacity, and various enhancements and improvement.

GHD will be responsible for detailed design, procurement and construction management support In the execution phase.

GHD’s process design skills have been utilised to develop the design required for the upgrade and to meet the BHP Billiton toll-gating requirements (a review process between stages of a project).

This project has been undertaken by GHD’s Adelaide office with support from the South Queensland and Roxby Downs offices.

Mining

image

From mine concept to closure, GHD considers geological, mine planning, materials handling, metallurgical, tailings, environmental management, operational and financial objectives to create optimal solutions for the many conflicting objectives in mine design and development.

With vast experience working with communities in rural, remote and urban locations, and the ability to assist both local and international clients, GHD provides sustainable management strategies to protect and enhance Indigenous cultural heritage, reduce environmental impact, maximise efficiency and enhance continuous improvement.

Read More . . .