Mining

The Rapu-Rapu Polymetallic Project is estimated to have a potential investment of US$ 42 million and potential gross sales of US$ 41 million per year. GHD undertook a range of project tasks for the developer (Rapu-Rapu Processing Inc) and the contractor (Leighton Contractors, Philippines, Inc.)

Services Rendered:

  • Review of concept design of port and facilities
  • Design and costing for site grading, port and internal roads
  • Detailed design of tailings dam and waste dump
  • Detailed water balance studies
  • On-site technical assistance and construction supervision of tailings storage facility

Materials Handling

image

By working with us, you can expect to benefit from capability that is built on strong theoretical understanding and delivered with with practical, real-world experience.

GHD’s services include planning, design and implementation of materials handling systems, structural inspection and analysis, bankable feasibility studies, cost estimates, engineering and project management for new projects and existing plant upgrades, trouble-shooting and custom design of purpose-built machinery.

Read More . . .

Mining Engineering

image

By engaging GHD, you’ll understand both the business and technical issues involved in delivering optimum project outcomes. The mining industry is a continually changing, competitive environment and together we can develop flexible, innovative solutions.

GHD systems synthesise the geological, mine planning, plant selection, mine infrastructure, tailings and environmental management, operational requirements and financial aspects of mining to address the many conflicting objectives in mine development.

Read More . . .