GHD was engaged by Red 5 Limited to carry out the detailed
design of the tailings storage facility (TSF). GHD also provides
construction support at the Siana Gold mine site in Surigao Del
Norte.
Services rendered:
Geotechnical investigations
Detailed design of the tailings storage facility and raw water
dam
On-site construction support to include quality assurance