Thermo King Industrial Facility MCU

GHD was engaged by Goodwin Constructions to obtain the relevant approvals for a new industrial facility at Darra, Queensland.

A Material Change of Use permit was required for the facility that now comprised a vehicle workshop, warehouse, spare parts store, and associated office and staff facilities.

Following approval of the project, GHD was asked to provide detailed design and documentation for the development site involving site grading (driveway access ramps and semi-trailer turnaround areas), pavement design, retaining wall design, stormwater quantity and quality design, and preparation of full construction drawings.

Pavement Engineering

image

Your single most valuable asset is arguably the pavement system within your network. We understand that pavements are subjected to static and dynamic loads as well as exposure to the elements; only sound engineering judgment, informed by experienced and qualified staff, can provide cost concious and appropriate solutions to your pavement challenges.

We demonstrate an innovative, sustainable approach through our relationships with research centres of excellence at Delft (Holland) Wisconsin (USA) Stellenbosch (South Africa) Transit New Zealand UWA (Western Australia) and ARRB (Australia).

Read More . . .