The Eastlink Project is integral to the state’s program for a
seamless transport network. Construction of the AUD$1.8 billion
freeway commenced in 2004 and was completed in 2008. GHD provided
services in roads and highways engineering, structural engineering
and tunnelling.
The project comprised over 40 km of freeway standard road, 1.5
km of twin tunnels, 16 grade separated interchanges, more
than 95 separate bridges, traffic control equipment and
intelligent transport systems, tolling systems and road furniture,
urban design elements and landscaping.
Read More . . .