Peter Selby-Smith

Peter is GHD's technical leader for bridges. Peter commenced his career with John Holland Constructions and for six years worked with contractors on site and in their design offices, in Australia, Europe and the UK. In 1977, he joined Maunsell and Partners, became Director - Engineering Structures and was responsible for the Mekong River Bridge, the New Echuca Rail Bridge and the James Harrison Bridge in Geelong. Since 1998, he has been Service Line Leader for Bridges with GHD and leads GHD’s bridge design group in Melbourne. He has over 35 years' experience in the design, construction and management of major bridge projects.

Position: Service Line Leader, Bridges
Tel: +61 3 8687 8000

GHD Library

The GHD library is a collection of relevant resources.