Close
Close Browser Alert
Browser Compatibility Notification
It appears you are trying to access this site using an outdated browser. As a result, parts of the site may not function properly for you. We recommend updating your browser to its most recent version at your earliest convenience.
  • Perspectives
  • Case Studies
    Toggle Section
    • Case Studies Search
  • Expertise
    Toggle Section
    • Advisory
      Toggle Section
      • Asset Management
      • Business Case Development
      • Finance and Economic Analysis
      • Logistics and Infrastructure Policy
      • Regulation and Access
      • Risk Management
      • Transaction Advisory
    • Buildings
      Toggle Section
      • Asset and Facilities Management
      • Automation: Data Acquisition, Operational Performance & Productivity
      • Demolition and Decommissioning
      • Digital Design
      • Geotechnical
      • Land Development and Urban Planning
      • Materials, Process and Plant Engineering
        Toggle Section
        • Materials Handling
        • Minerals Processing
        • Plant Engineering
      • Mechanical, Electrical, Fire and Life Safety
        Toggle Section
        • Electrical Engineering - Building
        • Fire and Life Safety
        • HVAC
        • Hydraulics - Building
      • Project Management
        Toggle Section
        • Project and Construction Management
      • Security, Information, Communication and Technology
        Toggle Section
        • Communication Systems
        • Security
      • Spatial Sciences
      • Structures
    • Digital
      Toggle Section
      • Digital Experience
      • Digital Lab (D-Lab)
    • Energy and Resources
      Toggle Section
      • Asset and Facilities Management
      • Automation
      • Chemicals
      • Dams
      • Engagement, Communication and Communities
      • Emergency Response
      • Geology
      • Geotechnical
      • HSE Systems and Industrial Hygiene
      • Impact Assessment and Permitting
      • Integrated Water Management
      • Materials, Process and Plant Engineering
        Toggle Section
        • Materials Handling
        • Minerals Processing
        • Plant Engineering
      • Materials Technology
      • Mechanical, Electrical, Fire and Life Safety
        Toggle Section
        • Electrical Engineering - Building
        • Fire and Life Safety
        • HVAC
        • Hydraulics - Building
      • Mining Engineering and Geosciences
      • Oil and Gas
      • Power
      • Project and Construction Management
      • Risk Management
      • Spatial Sciences
      • Tailings (Mines and Residue)
      • Wastewater Treatment and Recycling
      • Tunnels
      • EPCM
    • Environment
      Toggle Section
      • Air and Noise
        Toggle Section
        • Computational Fluid Dynamics
      • Aquatic Sciences
      • Contamination Assessment and Remediation
      • Demolition and Decommissioning
      • Engagement, Communication and Communities
      • Environmental Strategy Consultation
      • Food and Agriculture
        Toggle Section
        • Agriculture
        • Food Processing
        • Forestry Management
      • HSE Systems and Industrial Hygiene
      • Hydrogeology
      • Hydrology and Hydrodynamics
        Toggle Section
        • Climate Change
        • Waterways and Coastal
      • Impact Assessment and Permitting
      • International Development Assistance (IDA)
      • Maritime and Coastal Engineering
      • Natural Resources
      • Spatial Sciences
      • Sustainability
      • Waste Management
    • Future Communities
    • Future Energy
    • Future of Water
    • Geosciences
      Toggle Section
      • Contamination Assessment & Remediation
      • Dams
      • Geology
      • Geotechnical
      • Hydrogeology
      • Mining Engineering and Geoscience
      • Risk Management
      • Spatial Sciences
      • Tailings (Mines and Residue)
      • Tunnels
    • Project Management
      Toggle Section
      • Construction Contracting
      • Engagement, Communication and Communities
      • EPCM
      • International Development Assistance (IDA)
      • Project and Construction Management
    • Transportation
      Toggle Section
      • Air and Noise
      • Asset and Facilities Management
      • Aviation
      • Bridges
      • Digital Design
      • Engagement, Communication and Communities
      • Geotechnical
      • Impact Assessment and Permitting
      • Maritime and Coastal Engineering
      • Materials Technology
      • Railways
      • Road Systems
        Toggle Section
        • Pavement Engineering
        • Road Network Management
        • Road Systems
      • Structures
      • Transportation Planning and Traffic Engineering
      • Tunnels
      • Intelligent Transport Systems
    • Water
      Toggle Section
      • Automation
      • Circular Economy
      • Dams
      • Food and Agriculture
        Toggle Section
        • Agriculture
        • Food Processing
        • Forestry Management
      • Hydrogeology
      • Hydrology and Hydrodynamics
        Toggle Section
        • Climate Change
        • Waterways and Coastal
      • Impact Assessment and Permitting
      • Integrated Water Management
      • Maritime and Coastal Engineering
      • Spatial Sciences
      • Wastewater and Stormwater Collection Systems
      • Wastewater Treatment and Recycling
      • Water Treatment and Desalination
        Toggle Section
        • Desalination
        • Water Treatment
      • Water Collection and Distribution
      • Construction Contracting
  • Contact
    Toggle Section
    • Feedback Form
  • About Us
    Toggle Section
    • Annual Review
    • Community
    • Health, Safety and Environment
    • History
      Toggle Section
      • A Firm Foundation
      • Breaking New Ground
    • Integrity Management
    • News and Insights
      Toggle Section
      • Transforming perspectives on complex sites
        Toggle Section
        • Water
        • Energy & Resources
        • Benzene Fenceline Monitoring Program
        • Property & Buildings
        • Transportation
        • Digital
        • Advisory
        • Project Management
        • Planning for uncertainty
        • Non-revenue water losses
        • Achieving business sustainability
        • Flood Modelling and Water meter Calibration
        • Waste to Energy for Wastewater Treatment
        • Integrated Water Management
        • Resource Recovery from Wastewater
        • Transitioning to customer-centric apporaches
        • Groundwater Quality Monitoring at CCR Units
        • California children affected by lead poisoning
        • Water Recycling Fund Program
        • Upgrading Kangaroo Creek Dam
        • Complying with industrial stormwater planning updates
        • EPA 2017 Stormwater Construction General Permit
        • Filtering microplastics
        • Lead in Drinking Water
        • Permitting for industrial stormwater discharge in Illinois
        • Storm Water Grant Program (SWGP)
        • Water Recycling Fund Program
        • Microgrid in WA
        • EPA 2017 Stormwater Construction General Permit
        • Permitting for industrial stormwater discharge in Illinois
        • Court upholds emission monitoring for oil and gas
        • Storm Water Grant Program (SWGP)
        • Enabling electricity evolution
        • Groundwater Quality Monitoring at CCR Units
        • Infrastructure owners face change
        • Proposed emission reductions for oil and gas
        • Underground storage closure requirements
        • US Congress votes to lift US oil export ban
        • EPA 2017 Stormwater Construction General Permit
        • Managing Outrage
        • Groundwater Quality Monitoring at CCR Units
        • Lead in Drinking Water
        • Proposed emission reductions for oil and gas
        • USEPA intends to expand the Risk Management Program
        • Transforming perspectives on complex sites
        • Complying with chemical data reporting
        • Risk Assessment and Toxicology Update On TSCA Reform
        • Court upholds emission monitoring for oil and gas
        • California Organics Diversion Regulatory Update
        • California children affected by lead poisoning
        • Change Notification to ISO 14001:2015
        • Task force recommendations for expedited site cleanup
        • Proposed Revisions to Site Remediation MACT
        • New Ontario online registry for environmental permits
        • Federal guidance released for human health risk assessments
        • Revised UST regulations
        • Lead levels updated for remediation
        • Remediation guidance for adaptive site management
        • USEPA intends to expand the Risk Management Program
        • New toxicity values for EPA screening calculator
        • TSCA Reform is on its way to become a law
        • New Strategy for Waste-Free Ontario
        • Final ruling issued on exposure to Crystalline Silica
        • Fill and Excess Soil Regulatory Update
        • EPA 2017 Stormwater Construction General Permit
        • Future of Western Sydney
        • USEPA Vapor Intrusion Technical Guide
        • Hazard awareness training for demolition services
        • Big Data
        • Digital Technologies
        • Digital Disruption
        • Canada hosts international forum on public private partnerships
        • Public private partnership forum examines lessons for transit
        • New Strategy for Waste-Free Ontario
        • Hazard awareness training for demolition services
        • Complying with chemical data reporting
        • Fill and Excess Soil Regulatory Update
        • Project Management for Large Transport Projects
        • Public private partnership forum examines lessons for transit
        • Canada hosts international forum on public private partnerships
        • Transforming perspectives on complex sites
        • Risk Assessment and Toxicology Update On TSCA Reform
        • Critical insights from P3 2017 in Toronto, Canada
        • Pioneering New Energy Systems
          Toggle Section
          • Protecting Critical Energy Infrastructure
        • Solving the PFAS puzzle
        • How major rail is keeping pace
      • News
      • Publications
      • Insights
        Toggle Section
        • Committed to communities
    • Our leadership
      Toggle Section
      • Our Board
      • Enterprise Leadership Team
    • Proud to be employee owned
    • Sustainability
    • Values and Culture
    • Vendors
Skip to Content
iCreate Base Site Logo
  • Perspectives
  • Case Studies
    • Case Studies Search
  • Expertise
    • Advisory
    • Buildings
    • Digital
    • Energy and Resources
    • Environment
    • Future Communities
    • Future Energy
    • Future of Water
    • Geosciences
    • Project Management
    • Transportation
    • Water
  • Contact
    • Feedback Form
  • About Us
    • Annual Review
    • Community
    • Health, Safety and Environment
    • History
    • Integrity Management
    • News and Insights
    • Our leadership
    • Proud to be employee owned
    • Sustainability
    • Values and Culture
    • Vendors
Search
Global
Change Your Location
  • Global Global
  • Australia Australia
  • Canada (English) Canada EN
  • Canada (français) Canada FR
  • Chile Chile
  • China China
  • Fiji / South Pacific Fiji
  • New Zealand New Zealand
  • Papua New Guinea Papua New Guinea
  • Philippines Philippines
  • Qatar Qatar
  • Singapore Singapore
  • UAE United Arab Emirates
  • UK United Kingdom
  • United States United States
  • Awards and Rankings
  • Policy Statements
  • Quality Management Systems

P3-Richard Fechner

Public private partnership forum examines lessons for transit

HomeNews and InsightsTransforming perspectives on complex sitesPublic private partnership forum examines lessons...
  • News and Insights
    Toggle Section
    • Transforming perspectives on complex sites
      Toggle Section
      • Water
      • Energy & Resources
      • Benzene Fenceline Monitoring Program
      • Property & Buildings
      • Transportation
      • Digital
      • Advisory
      • Project Management
      • Planning for uncertainty
      • Non-revenue water losses
      • Achieving business sustainability
      • Flood Modelling and Water meter Calibration
      • Waste to Energy for Wastewater Treatment
      • Integrated Water Management
      • Resource Recovery from Wastewater
      • Transitioning to customer-centric apporaches
      • Groundwater Quality Monitoring at CCR Units
      • California children affected by lead poisoning
      • Water Recycling Fund Program
      • Upgrading Kangaroo Creek Dam
      • Complying with industrial stormwater planning updates
      • EPA 2017 Stormwater Construction General Permit
      • Filtering microplastics
      • Lead in Drinking Water
      • Permitting for industrial stormwater discharge in Illinois
      • Storm Water Grant Program (SWGP)
      • Water Recycling Fund Program
      • Microgrid in WA
      • EPA 2017 Stormwater Construction General Permit
      • Permitting for industrial stormwater discharge in Illinois
      • Court upholds emission monitoring for oil and gas
      • Storm Water Grant Program (SWGP)
      • Enabling electricity evolution
      • Groundwater Quality Monitoring at CCR Units
      • Infrastructure owners face change
      • Proposed emission reductions for oil and gas
      • Underground storage closure requirements
      • US Congress votes to lift US oil export ban
      • EPA 2017 Stormwater Construction General Permit
      • Managing Outrage
      • Groundwater Quality Monitoring at CCR Units
      • Lead in Drinking Water
      • Proposed emission reductions for oil and gas
      • USEPA intends to expand the Risk Management Program
      • Transforming perspectives on complex sites
      • Complying with chemical data reporting
      • Risk Assessment and Toxicology Update On TSCA Reform
      • Court upholds emission monitoring for oil and gas
      • California Organics Diversion Regulatory Update
      • California children affected by lead poisoning
      • Change Notification to ISO 14001:2015
      • Task force recommendations for expedited site cleanup
      • Proposed Revisions to Site Remediation MACT
      • New Ontario online registry for environmental permits
      • Federal guidance released for human health risk assessments
      • Revised UST regulations
      • Lead levels updated for remediation
      • Remediation guidance for adaptive site management
      • USEPA intends to expand the Risk Management Program
      • New toxicity values for EPA screening calculator
      • TSCA Reform is on its way to become a law
      • New Strategy for Waste-Free Ontario
      • Final ruling issued on exposure to Crystalline Silica
      • Fill and Excess Soil Regulatory Update
      • EPA 2017 Stormwater Construction General Permit
      • Future of Western Sydney
      • USEPA Vapor Intrusion Technical Guide
      • Hazard awareness training for demolition services
      • Big Data
      • Digital Technologies
      • Digital Disruption
      • Canada hosts international forum on public private partnerships
      • Public private partnership forum examines lessons for transit
      • New Strategy for Waste-Free Ontario
      • Hazard awareness training for demolition services
      • Complying with chemical data reporting
      • Fill and Excess Soil Regulatory Update
      • Project Management for Large Transport Projects
      • Public private partnership forum examines lessons for transit
      • Canada hosts international forum on public private partnerships
      • Transforming perspectives on complex sites
      • Risk Assessment and Toxicology Update On TSCA Reform
      • Critical insights from P3 2017 in Toronto, Canada
      • Pioneering New Energy Systems
        Toggle Section
        • Protecting Critical Energy Infrastructure
      • Solving the PFAS puzzle
      • How major rail is keeping pace
    • News
    • Publications
    • Insights
      Toggle Section
      • Committed to communities
  • Annual Review
  • Community
  • Health, Safety and Environment
  • History
    Toggle Section
    • A Firm Foundation
    • Breaking New Ground
  • Integrity Management
  • Our leadership
    Toggle Section
    • Our Board
    • Enterprise Leadership Team
  • Proud to be employee owned
  • Sustainability
  • Values and Culture
  • Vendors

Interior Banner

title-banner-richard-fechner

Transit projects are a priority item for governments around the world, and many are considering a public private partnership (P3) model to help deliver them. What lessons have we learned to date to improve both the process and the outcomes?

Richard Fechner, Global Leader of Infrastructure Investment & Economics with GHD Advisory, spoke on a panel at the Canadian Council for Public-Private Partnerships's (CCPPP) 25th Annual Conference on November 6-7, 2017 in Toronto and shared the key takeaways he has learned from some of the biggest transit P3 projects in Australia.

Q: Why is the P3 model an attractive approach for governments looking to implement major transit projects?

A: As with other types of infrastructure, there are several reasons why this model is appealing. First, it allows the government to better allocate risk to those who are most able to bear it, in return for a sharing of responsibilities and rewards.

Second, it can help to accelerate the delivery of critical infrastructure, and for transit projects in particular this is a huge benefit. Congestion or lack of accessibility can create a massive drain on efficiencies, resources, and productivity, so improving connectivity can really benefit communities, both in the short and the long-term.

Third, it keeps highly emotional assets like transit under public ownership, while drawing on the expertise of design, construction and operating specialists who can contribute to the long-term optimization of the system.

Q: Is the Australian experience transferrable to other countries?

A: Australia is really one of the first countries to truly embrace this model of delivering infrastructure projects. For a country like Canada where this conference took place, there are a lot of parallels that make the Australian experience quite relevant. Both countries have similar legal frameworks. The federal and state/provincial governments are limited in what is acceptable on their balance sheets. They are both highly urbanized nations, where more than 80 percent of people live in cities, continually driving demand for new and upgraded infrastructure to support population growth. Australia and Canada have huge landmasses with regional/remote communities that also require essential services.

So you can see the general conditions and driving factors line up pretty well. Of course, all countries will have unique factors that will affect how P3s are structured and best utilized, but in general we have learned some lessons, especially around managing the risks and challenges, that can be broadly applied.

There are also great examples, such as the Sydney light rail, where the availability of new services has dramatically changed transport modes in a short time. Social and travel change can be fast tracked.

Q: What barriers do you think prevent private companies such as GHD from being involved in more P3 projects? How do you think this approach will evolve to solve some of the current problems with P3 arrangements?

A: There are many barriers, however there are three common ones for firms like GHD to participate in the P3 space. Risk is by far the most prominent, both technical and commercial. Depending on the requirements that flow down to a designer, these can be too challenging for firms of a certain size. Another is capacity. Usually a P3 project is of a certain magnitude that requires enormous time to bid and execute which is why design firms partner to share risk and tap into larger pools of technical capacity to meet the demands of a given project. A third barrier is demonstrable experience. While technically most firms can execute a project, the qualifying requirements of a P3 are stringent and firms need to have both the people and projects that match what a client expects. This can be a high bar to cross and can be difficult for smaller specialized firms to attain.

Strategic partnerships help address all of these barriers: share the risk, pool your talent and demonstrate common experience on relevant projects that improve your chance of making the shortlist.

Q: Can you tell us what some of these lessons learned are, as well as recommendations to apply them?

A: As with other large projects, P3 projects are still vulnerable to poor planning, technical or design flaws, political instability, heated public opinion, and over complicated or unsustainable financing practices - but with that in mind, there are particular ways that these risks can be better managed on a P3 project.

When crafting a P3, the focus should be on delivering the desired outcome - for example in transit projects, say reduced congestion or better regional connectivity. Then, while the project structure needs to be tailored to the specific circumstances, there is no need to have unwieldy or cumbersome structures - as much as possible, keep things simplified.

When it comes to spelling out risk-sharing, using a framework that can adapt to shifting risks as construction progresses is helpful, and ensures that risks are consistently managed while also insulating against imbalances from external shocks on demand and supply sides.

Risk allocation requires a fine balance and government must always ensure that the taxpayer is not saddled with onerous demands by the private sector. However this goes both ways, especially given P3s require the goodwill of private entities. Clauses that seek to completely abrogate risks are not conducive to this goodwill and ultimately cost more. Risk allocation must be equitable and borne by those who can bear it best.

In addition, completely removing risk also removes government incentive to have the project delivered effectively, given they no longer 'have skin in the game.' P3s are not tools that should allow private sector to be treated as 'risk-free money'. Public entities should not be content to allow private providers excessive leeway in the performance of specific contracts. All contract participants should be motivated to complete contracts to the best of their ability and to be accountable when things go awry.

With regards to technical planning, early and continual engagement with those responsible for the operation and performance of the network is paramount. The operations and maintenance contractor can have a significant influence on overall design outcomes. Strong leadership and direction, notably from the project director can go a long way in setting the course and avoiding delay or confusion. Multiple external stakeholder interfaces need to be well coordinated and specific requirements for the project must be agreed early. It is essential that a complete set of Specific Project Requirements are established and approved by all stakeholders before design and construction is even contemplated.

The real long-term value of a project needs to be rigorously tested, especially when tenders are awarded. A long-term "whole-of-life" approach should be used for decision-making, rather than being persuaded by the allure of inflated revenue streams, high upfront payments and short-term gains. This requires courage and foresight, as well as the acknowledgement that infrastructure projects are not financial instruments. They are a means of facilitating economic activity and require bulletproof technical appraisal and far-sighted political leadership to avoid confusion and delay. This is where keeping a focus on social outcomes can again be useful, as a reminder to treat infrastructure projects as more than just a financial transaction.

Finally, as cities grow in footprint or density, transit projects need augmentation or extension, so setting up initial projects with a plan to extend or add to the services later can provide enormous future-proofing for moderate up-front costs

Q:  Are there any last guiding principles or values that you would like to share?

A: The complex nature of P3 projects require both private and public bodies to commit high level resources to the execution of commercial and technical project facets. Strong leadership and the application of common sense should be used to avoid counter-productive construction incentives. Maintaining transparency is essential - not only for the sake of ethics, but because keeping workings outside the 'black-box' allows for correction of mistakes before projects reach the point of no return. Infrastructure provision is crucial to any functioning society, and transit projects are arguably one of the most highly visible types of projects in this era of global travel and demand for unfettered mobility. Finally -- build with the future in mind.

For more information, contact Richard Fechner.    

Follow Us: Twitter Facebook LinkedIn YouTube
News and InsightsLegal NoticesModern Day Slavery StatementPrivacy PolicyTerms of Use

Copyright © GHD 2020

Sitemap
Increase Contrast
Top