Supporting a more flexible energy system in South Australia with the Bungama Battery Energy Storage System Stage 1

GHD_Bungama Battery Energy Storage System

At a glance

We’ve been supporting Revera Energy (Revera) with the delivery of the 150 MW/300 MWh Stage 1 Bungama Battery Energy Storage System (BESS) project in South Australia – Revera’s first utility-scale battery in Australia to secure financing. Since financial close, we’ve provided owner’s engineering services, working alongside the Revera team through design, construction and commissioning. Our work has helped navigate technical, delivery and commercial considerations, contributing to the project’s successful completion and commencement of operations.

GHD supported Revera’s 150 MW/300 MWh Bungama BESS in South Australia with owner’s engineering from design to commissioning.

The challenge

As South Australia’s energy system evolves, large-scale batteries are playing an increasingly important role in providing flexibility and storage capacity across the National Electricity Market. Bungama BESS forms part of this transition while also marking an important milestone for Revera as its first battery project to reach commercial operation in Australia.

As the project approached financial close, Revera was pursuing a fully merchant financing model. At the same time, the team was working through technical requirements with its battery supplier and needed to establish clear requirements ahead of construction. Revera required independent engineering input to support these requirements and inform its negotiations with the battery supplier as the project moved from financial close into delivery.

Our response

We joined the project at this stage, working closely with Revera and its battery supplier to establish the technical basis for delivery. During the first two months, we worked with Revera to develop the project specification and provided engineering input as the technical aspects of the battery supply were progressed. This established a clear foundation as the project moved towards financial close and notice to proceed.

Following this initial engagement, Revera appointed GHD to provide owner’s engineering services through delivery. Working as an extension of the project team, we provided continuity of technical oversight across development, design, construction, commissioning and the transition to operation.

Our role included design reviews, technical assessments, site inspections and oversight of key delivery milestones, including bulk earthworks, concrete pours, battery deliveries and electrical system energisation. We also developed a construction-phase risk register focused on cost, contracts and program, and worked with the balance of plant contractor to progress design reviews and close-out activities, particularly across the civil works.

We supported health and safety, and energisation audits, defect inspections and payment claim reviews, including the mechanical completion claim. Later in the delivery phase, we supported Revera in establishing the project’s cybersecurity framework and technical requirements.

Together, these activities provided ongoing engineering support across design, construction and commissioning, helping the client identify and address issues as they arose while providing an independent technical perspective on key project decisions.

The impact

Bungama BESS Stage 1 commenced commercial operations in May 2026, providing 150 MW/300 MWh of battery storage capacity and connecting to the National Electricity Market through a 275 kV connection to ElectraNet’s Bungama Substation.

For Revera, the project represents an important milestone as its first commissioned battery project in Australia. It also provides a valuable reference point for progressing its broader pipeline and supporting a consistent approach to future BESS development and delivery.

The project demonstrates the value of integrated owner’s engineering support throughout the project lifecycle. Maintaining continuity across deliver provided Revera with consistent technical insight and oversight, supporting informed decision-making, proactive management of emerging issues and alignment between project objectives and operational outcomes.

For South Australia, Bungama BESS adds significant flexible storage capacity at an important stage of the state’s energy transition. By storing energy when renewable generation is abundant and making it available when demand is higher, the project supports the integration of increasing levels of renewable generation and contributes to a more flexible, resilient and reliable electricity system.