This project involved the preparation and processing of the Environmental Impact Study (EIS) for the Road Connection Project from Route 78 to Route 68, a highway approximately 9.5 km long located in the Santiago Metropolitan Region in Chile.
The challenge
GHD, in collaboration with their client, undertook the development and environmental permitting of a 9.5 km highway connecting Route 78 to Route 68 in the Santiago Metropolitan Region in Chile. The project faced several complex challenges, including:
- Significant route modifications during the process.
- A resettlement plan for the largest informal settlement in the region.
- Emissions management strategies in an area saturated with particulate matter.
Our response
- Relying primarily on in-house specialists rather than external consultants.
- Maintaining a high level of performance across all phases of the project.
- Demonstrating resilience and adaptability across leadership changes.
The impact
Securing environmental approval for a project of this scale is a major milestone in developing stronger infrastructure in Chile. The project will enhance regional connectivity and contribute to improving community quality of life for those serviced by the highway.