Accelerating the electric grid for a net-zero future: A GHD report

Accelerating the electric grid for a net-zero future: A GHD report

The race to net-zero is straining electricity transmission networks, which are struggling with delays, supply chain issues, and regulatory hurdles. Traditional project delivery models aren’t keeping pace with the urgent need for grid expansion. This report unpacks it all – what’s going wrong and why agile, collaborative approaches like Integrated Project Delivery (IPD) and Alliancing are key to unlocking faster, smarter development. With global investment in grids set to triple by 20301, embracing smarter, more flexible approaches to project execution is no longer optional – it is essential.

This report unpacks it all – what’s going wrong and why agile, collaborative approaches like Integrated Project Delivery (IPD) and Alliancing are key to unlocking faster, smarter development. With global investment in grids set to triple by 2030, embracing smarter, more flexible approaches to project execution is no longer optional – it is essential.

Bridging the transmission gap in decarbonisation

Electricity transmission networks are the essential enablers of the clean energy transition, connecting renewable generation sources to the people and industries that need it. But while renewable generation expansion surges ahead, transmission networks are becoming a critical bottleneck. This gap threatens power reliability and the entire decarbonisation ecosystem - including the production of future fuels like hydrogen and sustainable aviation fuel (SAF). To meet net-zero goals, transmission network expansion and reinforcement must become urgent infrastructure project priorities.

The bottlenecks preventing grid expansion

The bottlenecks preventing grid expansion - Accelerating the electric grid for a net-zero future A GHD report
The transmission sector’s ability to scale is being held back by systemic supply chain constraints, regulatory delays, growing community concerns and increasing energy demands. Lead times for critical equipment are stretching into years, forcing a shift toward early, strategic procurement purely to stay on schedule. Meanwhile, complex permitting processes and a lack of genuine community engagement continue to stall progress, even as energy demand surges from electrification and emerging technologies. Without urgent reform and investment, these bottlenecks will undermine the energy transition and stall decarbonisation efforts.

Inside the report

Delve into the most pressing transmission project and program delivery challenges - here’s what you’ll uncover:


  • Why traditional transmission project delivery models are no match for the pace of the energy transition.

  • How collaborative delivery models like Integrated Project Delivery teams and Alliancing can unlock faster, smarter grid development.

  • Real-world case studies showing how bold partnerships can overcome regulatory and supply chain roadblocks.

  • Insights into shaping your transmission project and program delivery strategy in today’s rapidly evolving energy landscape.
Download the report
The current global boom in large scale transmission projects calls for more collaborative program and project delivery models that improve delivery efficiency, secure resources, reduce delays, foster innovation and best allocate risks.  The electricity transmission sector can learn from and adapt best practice collaborative delivery from other infrastructure sectors that have faced similar challenges.”
— Carl Parlongo, Author and National Power Transmission & Distribution Leader - WA Energy
A mandate for change - Accelerating the electric grid for a net-zero future

A mandate for change

Read the latest from GHD to discover how bold, collaborative approaches can transform the transmission sector from bottleneck to enabler.