Imaginative thinking backed by global expertise.
Aging infrastructure, climate change, and emerging environmental risks are creating new challenges for US federal, military and civilian agencies. Planning and designing for better resilience is critical, as is restoring our natural assets to maximize their environmental value. To do this requires strategic advice that goes beyond the design and delivery of assets, drawing on deep knowledge of both technical capabilities and digital technologies.
By combining the expertise of our global and local teams, we provide environmental, infrastructure, facilities and security solutions that protect personnel living and working on US Federal installations and surrounding communities.
We also support major environmental and infrastructure resiliency efforts related to climate change and adaptation supported by our global experiences. We have the ability and international experience to co-create with you and deliver value at a pace that can match the requirements of larger and more complex projects.
Dedicated to delivering imaginative thinking and exceptional client service, we deliver lasting benefits within the communities in which we operate.
Below are projects for US Federal Government
Helping U.S. Army Corps of Engineers deliver its Civil Works Mission

The United States Army Corps of Engineers, Savannah District solicited the services of Architect-Engineer teams for implementing their civil works programs.
NAVFAC PACIFIC P-715 Live-Fire Training Range Complex (NW Field)

Due to relocation of USMC Forces from Japan to Guam, the development of ranges was required to meet individual qualification training requirements
NAVFAC PACIFIC P-735 AUTOMATED MPMG RANGE

GHD was retained by NAVFAC to construct an automated MPMG Range on the live-fire Training Range Complex. The project consists of a multi-lane machine gun range with multiple target emplacements in each lane.
Pier 6 Load Capacity Analysis

NAVFAC retained GHD-COWI JV to provide a condition survey, service life assessment and load capacity study of Pier 6 at Naval Base San Diego.
P-204 Wharf Improvements (Uniform & Tango) Phase 1 (Part E)

GHD was engaged by NAVFAC Marianas to construct and renovate a bulkhead wharf. This $10 million project provided infrastructure, wharf improvements, and new utilities at Tango Wharf, Apra Harbor in Guam.

Planning and designing for resilience requires strategic advice that goes beyond the design and delivery of assets. We draw on deep knowledge of both technical capabilities plus digital technologies to help ensure infrastructure resiliency and security.
Lisa Brandon
Federal Client Sector Leader, North America